Thursday, December 2, 2010

Act now to clean up the Duwamish river!

Seattle Community Council Federation


At our November meeting Heather Trim from People for Puget sound presented a compelling argument for prompt action. Here's a summary of what she told us:



warning.jpg


The Duwamish River is one of the most polluted sites in Puget Sound as well as one of the most polluted sites in the US. It is in the process of being cleaned up.  The River is polluted for 5.5 miles with PCBs, dioxin/furans, PAHs, and arsenic as well as 39 other chemicals at levels above standards.  We need your help in asking Environmental Protection Agency (EPA) and the WA Department of Ecology for a strong cleanup option.

Email EPA and Ecology to give your opinion about the cleanup by clicking here.
Or attend a public meeting and give your public comments:
December 7, 5:30–8:30 p.m.: Concord International Elementary School, 723 Concord Ave S, in South Park. Spanish interpretation, food and child care provided.
December 9, 3:30–8:30 p.m.: (with information sessions at 4:30 and 6:30 p.m.): South Seattle Community College–Duwamish Campus, 6737 S. Corson Ave., in Georgetown. Vietnamese interpretation and food provided.
EPA and the Department of Ecology have released a "menu" of 12 cleanup options for the Duwamish River.  The cleanup options have various proportions of the following techniques:
  •  “Natural recovery” in which the pollution is left in place and natural sedimentation from upriver slowly covers it over and dilutes it;
  • “Capping” in which a layer of clean sand and gravel is placed over the polluted area to create a barrier above the contaminated material; and
  • “Dredging” in which the polluted material is removed from the river and is transported to a hazardous waste landfill.
The costs of the 12 options range from $210 million (mostly natural recovery) to $1.3 billion (mostly dredging).  This range of options also ranges from least certain to most certain in terms of long-term success.  All of the cleanup options will take at least 10 years as this is a big site.
Unfortunately, none of the 12 options are expected to cleanup the river enough to protect the health of tribal and subsistence fishermen who eat the seafood from the river, mostly because of ongoing sources of pollution. The options don't describe what is being done to control continuing pollution, which has the potential to undermine the cleanup effort by recontaminating the river bottom with PCBs, dioxins, arsenic and other chemicals. No pollution control plans are currently in place for upriver sources.

People For Puget Sound is on the advisory forum for the Duwamish River Cleanup Coalition/TAG (DRCC/TAG).  DRCC/TAG has had the cleanup options reviewed by independent technical advisors and has the following main recommendations:
  • The river must be cleaned up to "natural background" levels to best protect human health
  • Upriver pollution source control must be addressed for an effective and equitable cleanup
  • Only one option (Alternative #6R) provides a permanent cleanup that ensures it is done once and done right
  • An Environmental Justice Assessment is needed to make sure that all populations are protected
Click here for the full fact sheet and a sample letter.
Click here for more information about the Duwamish River Superfund Site.

Click here to send an email to EPA and Ecology voicing your opinion.

Thank you for your help!
Cheers,

Rein Attemann,  rattemann@pugetsound.org
Heather Trim, htrim@pugetsound.org

Don't vandalize Seattle's skyline with unsightly illuminated signs

http://seattletimes.nwsource.com/html/opinion/2013570345_guest02ochnser.html
The Seattle City Council is considering changes to its rules about signs that could mar the city's skyline with giant illuminated signs. Guest columnist Jeffrey Karl Ochsner argues the city should preserve the sense of the city's civic identity apparent under current sign rules.
Special to The Times

2013570347.html.jpgELLEN M. BANNER / THE SEATTLE TIME
Downtown Seattle looks glorious viewed from Elliott Bay.

THE city of Seattle may be poised to approve an ordinance that will permanently deface the downtown skyline. A Nov. 6 Seattle Times editorial noted that unnamed "dignitaries" were amenable to rewriting the Seattle Municipal Code to allow Russell Investments to put giant illuminated signs at the top of their building, the former WaMu Tower.
A City Council committee will consider proposed revisions to the sign-code portion of the Seattle Municipal Code at a public hearing Dec. 7. A council vote on the issue may occur before Christmas.
Adding giant illuminated signs to the former WaMu Tower will mar the downtown skyline. The Tower is nearly dead center in the skyline. The bright lights will make the Russell Investments sign the primary focus of the skyline. The state outlawed billboards in 1961, but the Russell Investments sign will turn the downtown skyline into a giant billboard.
The proposed changes are a shocking give-away of our skyline. This kind of special favor for a special interest undermines the integrity of Seattle governance. Allowing giant illuminated signs will blight the skyline that Seattle has protected for the last half century. The proposed changes contravene our Comprehensive Plan.
The sign code currently allows downtown signs for business tenants only below 65 feet. Hotels and public buildings may have signs above 65 feet because these signs help us find places for public access and use.
The proposed changes would allow any tenant downtown with more than 200,000 square feet of space to have giant illuminated signs near the tops of downtown buildings. Signs could be up to 324 square feet on four sides of a building, or up to 648 square feet on two sides of a building more than 500 feet tall. Giant illuminated signs up to 18-by-36 feet or 12-by-48 feet or 10-by-64 feet would be allowed.
The downtown skyline is a tremendous asset forming a memorable image within our natural setting. Victor Steinbrueck called attention to the extraordinary value of our skyline nearly 50 years ago in "Seattle Cityscape," writing, "Seen from west of the bay, at a small lookout park on the tip of Duwamish Head, the central business district provides a thrilling panorama by day and by night."
The city of Seattle Comprehensive Plan "Culture Resource" section cites the skyline as central to our civic identity: "Over time, Seattle has acquired many features that people have come to identify with the city. Among them are ... the downtown skyline, distinguished by landmarks such as the Smith Tower." But now, with little public discussion, this will be discarded and forgotten.

The Municipal Code currently restricts signs at the tops of downtown buildings to protect our skyline for the enjoyment of everyone. The Comprehensive Plan specifically calls for "reducing visual clutter" and "limiting the signs at the tops of buildings," yet this is being ignored.
If approved, the proposed changes will set an appalling precedent. What happens when a tenant with 150,000 or 100,000 square feet asks for equal treatment? The Russell Investments signs open the door to untold visual clutter on our skyline.
The code changes undermine Seattle's claim to be a sustainable city. Giant illuminated advertising signs will consume energy for commercial advertising, contributing nothing to the community.
Seattle City Council must recognize how appalling the proposed sign-code revisions are. The integrity of the Seattle Municipal Code and the Comprehensive Plan is at stake.
After a half-century of treasuring our Seattle skyline, why is the city poised to allow it now to be vandalized? The skyline belongs to all of us. It should not be given away.
Jeffrey Karl Ochsner is a professor of architecture at the University of Washington.

OUTSIDE CITY HALL A neighborhood manifesto for change


OUTSIDE CITY HALL
A neighborhood manifesto for change

Carolee Colter and John V. Fox  (reprinted from Dec 1, 2010 edition of Pacific Publishing Co. Newspapers)

Looking ahead to the 2011 Seattle City Council election, it’s not too early to start thinking about how to make City Hall more responsive to our neighborhoods and the cause of social justice.

The five seats now occupied by councilmembers Tom Rasmussen, Jean Godden, Tim Burgess, Bruce Harrell and Sally Clark will be contested.

Early next year, housing and neighborhood activists expect to convene an ad hoc group to discuss whether to run our own candidates in any of these races or find other ways to make all our electeds more sympathetic to our needs.

Right now, it appears likely that most, if not all, incumbents will seek reelection. And given the power of incumbency, we know how difficult it would be to beat any of them.

Only Godden, who routinely sides with development interests, seems to be in any way vulnerable.

Time to limit growth
There are other ways for neighborhood activists to challenge the status quo. Putting an initiative on the ballot, for instance, to block the current upzone-redevelopment-tear-down craze could save both trees and low-income housing.

The “creeks initiative” from 2003 was a good example. Had the courts not struck it down, that initiative would have thrown a serious monkey wrench into developers’ plans across our neighborhoods.

Another option might be creation of a “Neighborhood PAC,” or a Municipal League-like entity to evaluate and rate candidates in terms of their stance on issues important to the neighborhoods.

And there’s always another push for district elections. By making City Council members represent specific districts, they would become more directly accountable to their constituents instead of the moneyed special interests who donate to their campaigns.

And it would become much more financially feasible to those without corporate donors to get elected since TV advertising would no longer be as cost-effective as door-to-door campaigning. That’s why corporate interests went all out to (successfully) defeat an initiative for district elections in 2003.

Whether we run candidates, rate candidates or work to get initiatives on the ballot, our theme should be limiting growth to responsible, managed levels.

As we come out of the economic downturn, we need mechanisms in place to preserve our trees, greenspace, affordable housing and the physical and social character of our neighborhoods — the things that make this city livable — before growth accelerates again to the runaway levels we experienced before the recession hit.

What we really need
We’ve seen too much growth, and our current elected leaders are too beholden to developers, Paul Allen and downtown interests. It’s time developers started paying their fair share of the costs of growth, in the form of one-for-one replacement of affordable housing units they remove.

We need stronger tree protections (not fewer) and no more upzones in our neighborhoods, period.

Impact fees should replace regressive revenue sources, such as increases in property taxes, user fees, tolling and the business-and-occupation tax. Small businesses, working people, low-income people, including many longtime residents, are all being nickeled-and-dimed to death.

Let’s stop tapping the general fund for big-ticket projects that serve special interests and put them on special ballots rather than bridge repairs, crosswalks and funding for our libraries and community centers — that’s what the general fund is for.

Root out the millions in our general fund going to South Lake Union and downtown.

No to fixing the “Mercer mess,” and no to the Alaskan Way Viaduct-replacement tunnel!

No to adding more lanes to state Route 520.

More for buses, and less for Sound Transit and streetcars.

Kill the stoplight cameras, bring parking-meter rates back down and limit “road diets” to those areas where the neighborhoods want them.

More police accountability — it’s time for a real citizen-review board with subpoena powers and power to impose penalties and consequences.

Good stewardship
The big lie is the assumption that Seattle isn’t doing its share to absorb density and growth, to prevent sprawl and curb global warming. In nearly every neighborhood, including most of the areas around train stops, we’ve exceeded our growth targets.

There’s something wrong with advocating for open-space preservation outside the city but, once across the city line, aiding and abetting the pouring of concrete and wiping out of trees, stamping out every last vestige of nature for urban dwellers outside of parks.

Good stewardship of our environment begins right here in our own neighborhoods: protecting our trees, preserving space in all our neighborhoods for essential urban gardening, saving urban streams — and, not coincidentally, preserving our existing stock of low-income and affordable housing.

It’s right in our neighborhoods where we can make the most impact on climate change, not somewhere else.

Although this runs counter to conventional wisdom and special interests, we need to publicize and promote the notion of a “steady state economy,” a realization that growth anywhere of any kind at accelerated rates is anathema to a healthy environment.

In the interim, a poly-centered approach to growth for the region — distributing it where people are already living and not concentrating it all in Seattle — is the most cost-effective and environmentally sound way to manage the growth we have.

We progressives need to reclaim the environmental high ground, and that means learning to say no to growth.

JOHN V. FOX AND CAROLEE COLTER are coordinators for the Seattle Displacement Coalition (google us), a low-income housing organization or email us here or ph: 206-632-0668.

SEATTLE COMMUNITY COUNCIL FEDERATION

Founded in 1948, the Seattle Community Council Federation is one of the nation's oldest and most active coalitions of neighborhood groups.  Yearly dues for member groups are $50.  SCCF welcomes new member groups, and encourages renewal by groups whose membership in SCCF may have lapsed.  Individual donations are also welcome and tax deductible, and go very far, as SCCF is an all-volunteer 501(c)(3) organization.  Please mail your check to SCCF, 2370 Yale Avenue East, Seattle, WA  98102-3310.  For questions, contact treasurer Chris Leman, (206) 322-5463, cleman@oo.net.

Keep up-to-date at our blog/website www.seattlefederation.blogspot.com



Wednesday, December 1, 2010

Deep Bore Tunnel forum Today, December 1, at 7:30 p.m. in Town Hall on First Hill.

Urban Politics #303 11/30/10

THE DEEP BORE TUNNEL CONTROVERSY

By City Councilmember Nick Licata
with assistance from Newell Aldrich

Replacing the Alaskan Way Viaduct has more twists and turns than a Hitchcock movie, and the final credits are still a long way off. The latest plot twist introduces two new developments.

First, the Sierra Club and Real Change are considering a city initiative to stop the deep bore tunnel from being built unless certain conditions are met. Under the name Move Seattle Smarter, they are trying to craft an initiative that would protect Seattle taxpayers from any potential cost overruns before construction could begin. They would need to collect about 25,000 signatures to assure placing the initiative on the ballot in late summer or fall of next year, although it still could face a legal challenge for overreaching the intended authority granted to citizens through the initiative process.

Second, state initiative promoter Tim Eyman testified before the Washington State Transportation Commission that the commission lost the power under state law to set toll rates when his Initiative 1053 passed this fall. I-1053 said that all legislative action raising taxes must be approved by two-thirds of the Legislature, and any new or increased fees require majority legislative approval. Since funding for the deep bore tunnel is dependent on about $400 million in tolls, the state legislature would have to vote to set the tolls rates, rather than the State Transportation Commission. The State Attorney General is examining this issue at the request of a state senator; opinions generally take 60 days.

It may not be easy for the legislature to set tolls without opening up the issue of project funding and cost overruns. Worse, if the costs for the tunnel go over the set-aside contingency (i.e. goes over budget) the state legislature would need a two-thirds vote if they were to raise taxes to pay for the gap.

Although the Democrats will still control both the State House and Senate, their majority has shrunk. That leaves less room for Seattle's delegation to collect the votes that may be needed to address these issues if Eyman's interpretation is correct.

Meanwhile the State is evaluating the two bids that have been submitted for construction of the deep bore tunnel. It is expected that the State will accept one of them before the end of the year. A contract with the winning bidder would then be signed in the first quarter of next year and construction will follow. Any attempts to stop the project would be increasingly difficult after the contract is signed. This means that the question of who covers any eventual cost overruns would be most likely decided through some understanding reached between the Governor and the State Legislature.

The public debate so far has focused on the deep bore tunnel's financial risk to Seattle taxpayers. Of the $900 million City contribution for tunnel-related projects the Mayor has criticized, $500 million is for the Seawall and utility relocation-costs the state would have picked up for an elevated replacement. It's ironic that some opponents of the elevated option now criticize this spending, when many urged a no vote on the elevated option in 2007 which would have had these costs paid for by the state. The elevated also didn't put extra traffic onto city streets, because it had six lanes and tolls weren't needed, another key objection of tunnel critics. In addition, the Governor agreed the state would pay the replacement cost for an elevated, removing the issue of cost overruns.

Those calling for transparency in the State's and City's decision-making would hope to make the potential risk of building a deep bore tunnel readily apparent to the general public. Their focus has been on the financial risk of the project. Thus, the other main objection-made earlier by a number of environmentalists-over the tunnel's failure to curb vehicle usage is largely being ignored. Why is that? It could be because the other options have major problems.

In 2008 the state's stakeholder advisory group made two recommendations: one was a 6 lane surface/transit option that would have turned Western Avenue into a 3 lane road, which would have presented a huge environmental impact to the north end of Pike Place Market which it passes by; the other was a smaller 4-lane elevated viaduct, with bigger and bulkier columns, but fewer of them. Political forces representing various constituencies in Seattle effectively blocked either solution. Both options included transit, due to reduced road capacity; the state has yet to authorize any tax options to fund additional transit operations for the deep bore tunnel option.

At the last moment, the Governor met with then Mayor Greg Nickels and King County Executive Ron Sims, and they came up with the deep bore tunnel solution. It was seen as freeing up the waterfront from an obtrusive elevated viaduct and providing a functioning corridor through the city, one that was not seen as viable with the surface-only solution. A surface option could also be more expensive for Seattle than other options, unless the Viaduct is torn down with anything to replace it. It is questionable whether the state legislature would authorize funding a non-freeway surface option, so the City could well be on its own.

Whether Tim Eyman or Move Seattle Smarter efforts to halt the deep bore tunnel succeed or not, the controversy over it as the best replacement for the Alaskan Way Viaduct will continue until it is built or the bill has been paid.

The Stranger, a consistent critic of the deep bore tunnel, is sponsoring a forum this Wednesday, December 1, at 7:30 p.m. in Town Hall on First Hill. To date three speakers have been confirmed on the panel: Mayor Mike McGinn, City Councilmember Mike O'Brien and a speaker from Move Seattle Smarter.

Below is a short history on how we got to our present situation, for those who want additional details.

VIADUCT TIMELINE

In 2001 the Nisqually earthquake damaged the Alaskan Way Viaduct. In 2002, the City Council passed a resolution in favor of a tunnel to the extent feasible (I voted no). The then-estimated cost was $10 billion.

In 2003, I asked the state to examine repairing the Viaduct; they didn't find it feasible. In 2006, when a new proposal arrived, I again asked the state to study a "retrofit". They found it could be done, but would cost almost as much as rebuilding it. During this time, various pro-tunnel resolutions were passed by the Council by 8-1 or 7-2 votes.

In 2006, as then Council President I commissioned a study of a 6-lane surface option.  The study indicated it would result in more pollution, greater congestion, and showed how streets with too much vehicle traffic quickly become pedestrian unfriendly. Critics charged the consultants used WSDOT data that they consider unreliable. The 2004 EIS showed that traffic speed with a 6-lane surface option would average about 12 miles per hour in both directions. Many surface supporters favor a 4-lane option.

In 2006 I also proposed a public vote.

In December 2006, the Governor released a report stating the State would fund an elevated replacement, but that the City would need to provide additional funding for a tunnel, including cost overruns.

In March 2007, public votes took place on two options. $2.8 billion was available in state funding for SR 99 replacement, (costs include south end work of roughly $1 billion):

*         Elevated Structure: a $2.8 billion 6-lane elevated: it was fully funded by the state, with no tolls, no impact on city streets according to EIS, utilities and seawall were paid for by the state; the existing Columbia, Seneca and Elliott ramps would be re-built.


*         Surface-tunnel hybrid: a $3.4 billion four-lane cut and cover tunnel, with 2 wide shoulders for peak hours, to be funded with $2.8 billion state funds, $500 million city utility funds; $250 million localized tax on specially benefited landowners.

Both measures went down, with 43% yes on the elevated, 30% yes on the surface-tunnel hybrid.

Subsequent to the public vote, the state legislature removed $400 million from the project and shifted it to the 520 bridge replacement project, leaving $2.4 billion. Any project costing more would need another funding source, such as tolls.

After the vote, the Council passed the Urban Mobility Plan to explore a surface option, and WSDOT, Seattle and King County convened a Stakeholder Advisory Committee that met in 2008.

The Stakeholder group reviewed eight options that were generally 4 lanes for a Viaduct replacement. Because a 4-lane elevated or tunnel (and surface options) would have less capacity than the current Viaduct, a separate menu of options was developed to add capacity to I-5, city surface streets, and transit, and possibly streetcars.

The Stakeholder group then reviewed two "hybrid" options, one elevated, one surface, that all included some I-5 work, transit, and city surface street work.

First was a SR 99 Elevated Bypass Hybrid, with two independent two lane side-by-side viaducts. In South Lake Union, it included a new underpass at Republican, with the following:

*         Cost: $1.67 billion (including risk/contingency)

*         $640 million extras ($103 million I-5 work, $234 million city streets, $267 transit, all include risk), + $130 million construction mitigation

*         Total $2.4 billion (including $1.1 billion south end SR 99 work: $3.5 billion)

Opponents of an elevated option weren't appeased by this reduced-size proposal.

I-5/Surface/Transit Hybrid The surface option would convert Alaskan Way and Western into 3-lane one-way streets to replace the Viaduct. In South Lake Union, it would include 5 signalized crossings over Aurora, and 28 stoplights in a new SR 99 corridor along the waterfront. The option includes:

*         $929 million (including risk/contingency)

*         $1.28 extras ($553 I-5 work, $216 city streets, $476 million transit, all include risk), + $30 million construction mitigation

*         Total, $2.2 billion (including $1.1 billion south end SR 99 work: $3.3 billion)

The Pike Place Market was alarmed by the prospect of converting Western to a high-capacity road adjacent to the pedestrian environment of the Market; in any case, the surface option isn't inexpensive, as some seem to think.

Around $250 million or so can be reduced from south end cost estimates, since bids have come in lower. The City had already committed to funding some of the road work above. In addition, those estimates included $250 million seawall and $250 million in utility relocation, costs the City has since agreed to pay as part of the tunnel project. Thus, both options could have been economically feasible.

In December, supporters of a bored tunnel proposed a single-bore tunnel, less expensive than the twin-bore tunnel WSDOT had considered. It was presented to the Stakeholder group.

In January 2009, the Governor and then Mayor Nickels and King County Executive Sims signed an agreement to proceed with a 4-lane $1.9 billion bored tunnel as part of a $4.2 billion plan. The City helped reduce cost estimates for the tunnel by agreeing to pick up the utility and seawall costs, roughly $500 million.

This option has one key advantage over the others: it won't require closure of the viaduct, and a construction impact period of several years. On the other hand, the risk may well be higher. Funding for transit has yet to be secured.

In April 2009, the State legislature required that $400 million in tolls be used to fund the states $2.8 million portion of the agreement.

The use of tolls reduces the projected number of vehicles that would use the tunnel, especially during rush hour, when tolls would be higher.

The legislature further limited the state's contribution to $2.8 billion, and stated that any extra costs would need to be borne by "property owners  in the Seattle area who benefit from the replacement of the existing viaduct with the deep bore tunnel", a provision the State Attorney General and City Attorney have both said is not enforceable. The state legislature would need to take action in the future to craft separate legislation to attempt to enforce it, which would be difficult at best, because the state cannot create local taxing districts (only local governments can).

In July, Initiative 101 was filed to prohibit construction of a tunnel or use of City right-of-way for a tunnel to replace the Alaskan Way Viaduct. Signatures are being collected for this previous effort but it seems unlikely that its sponsors collect enough signatures in time to present it on the fall ballot.

The Council voted in August 2010 to support the tunnel in a resolution endorsing the drafts of agreements that say the State shall pay costs. I proposed an amendment the Council passed subjecting the resolution to the state legislature not enacting legislation to overturn WSDOT's responsibility for costs, including cost overruns, set out in the agreements.

In mid-October, WSDOT released a poll of Seattle and inner suburban residents.  It showed support 69-27 for a bored tunnel over surface, 65-30 bored tunnel over a rebuild, and 52-41 rebuild over surface. Some criticized it as biased.

In October, WSDOT offered the bidders concessions to cover inflation, bonds, insurance, and building damage. This reduced the contingency budget from $415 million to $235 million.

On October 29, the Governor announced that both bids came in within budget.


COUNCIL MEMBERS & MAYOR'S EMAIL ADDRESSES

Sally.Bagshaw@seattle.gov<mailto:Sally.Bagshaw@seattle.gov>
Tim.Burgess@seattle.gov<mailto:Tim.Burgess@seattle.gov>
Sally.Clark@seattle.gov<mailto:Sally.Clark@seattle.gov>
Richard.Conlin@seattle.gov<mailto:Richard.Conlin@seattle.gov>
Jean.Godden@seattle.gov<mailto:Jean.Godden@seattle.gov>
Bruce.Harrell@seattle.gov<mailto:Bruce.Harrell@seattle.gov>
Nick.Licata@seattle.gov<mailto:Nick.Licata@seattle.gov>
Mike.OBrien@seattle.gov<mailto:Mike.OBrien@seattle.gov>
Tom.Rasmussen@seattle.gov<mailto:Tom.Rasmussen@seattle.gov>

Citizens are directed to the following website to complete a form to send an email to the Mayor's Office. http://www.cityofseattle.net/mayor/citizen_response.htm


URBAN POLITICS SUBSCRIPTION INSTRUCTIONS

To subscribe, send a message to: urbanpolitics-subscribe@speakeasy.neturbanpolitics-subscribe@speakeasy.net>
To unsubscribe, send a message to: urbanpolitics-unsubscribe@speakeasy.neturbanpolitics-unsubscribe@speakeasy.net>
You do not need to include anything in the body of the messages.

Tuesday, November 30, 2010

Multifamily Development Regulations Need Further Analysis

Editor's note: This is a lengthy post, perhaps requiring an uncommon willingness to read all the way through, a necessity for fuller comprehension of Seattle's complex and vexing housing/zoning situation.


SEATTLE COMMUNITY COUNCIL FEDERATION

November 22, 2010

Councilmember Sally Clark, Chair, Committee on the Built Environment

Members of the City Council
600 Fourth Avenue
Seattle, Washington 98124-4749

Subject: Multifamily Development Regulations Need Further Analysis

Dear Councilmember Clark and Members of the City Council:

For many years concerned citizens and neighborhood organizations have drawn the City’s attention to problems associated with rampant townhouse development in our low rise zones. These cramped “4 pack” projects typically provide inadequate access and open space, and they destroy rather than enhance the established development patterns of our neighborhoods. In places they cover whole city blocks. They stand in stark contrast to the dense livability envisioned by the Urban Village strategy underlying our City’s Comprehensive Plan. And they are a testament to what misguided development can do to our communities. The Seattle Community Council Federation, a coalition of community groups throughout the city of Seattle, offers the following comments on these important issues.

The Federation has argued that many of these undesirable projects are the result of lax administration such as a willingness to ignore access easement requirements. But the Nickel’s administration chose a major rewrite of the multifamily code which, after an independent analysis by independent teams last year (the ‘black hat/white hat’ exercise) initiated a further rewrite in the hands of Council.

Trying to rewrite the development rules for the city's most affordable housing class that covers almost 6 square miles spread throughout our city is a challenging task, but one that should acknowledge the variety of conditions under which it will be applied. While the overhaul generally attempts to encourage development in designated “areas of change” (our Urban Villages), it does not ensure that infill respects ‘context’ in our “areas of stability” (outside of the Urban Villages) where predictability and consistency of neighborhood building forms are most desired.

We recognize the tremendous effort that has gone into this process, and acknowledge improvements have been made over the last several months. But we are concerned that the final stages are being driven more by schedule than results, and that additional work necessary to resolve real problems will not be allowed. Despite earlier indications that another independent ‘black hat/white hat’ review would be undertaken, it seems that COBE is intent on asking for passage as soon as possible. We think this is a mistake and will net a flawed code despite the years of effort.

What follows are what some examples of the most pressing issues that are imperative to address in the final legislation to avoid a variety of unintended consequences.

Abandonment of Urban Design Principles

We want to make it clear that we assert that some very specific faults remain with the code which would be clearly shown if an independent ‘black hat/while hat’ review exercise were undertaken.

1. Focusing on building types and the removing the public from the review process makes it likely that existing and intended development patterns will be ignored and neighborhoods with inconsistent streetscape characteristics and yard patterns will result.

The conversion of front and back yards to minimal setbacks, and the elination of side setbacks for end rowhouse will result in the placement of buildings incongruous with its neighbors. This will also introduce privacy and security failures. Respect of development patterns is a clear Comprehensive Plan goal, particularly outside of Urban Villages.

2. The upzoning of LDT à LR1, and L1 à LR2 and L3à L4 (LR3) in Urban Villages, coupled with removal of parking requirements in Urban Villages, will result in over-densification when green building bonuses are used. [1]

A few simple examples will best illustrate this dramatic flaw (see attachment for more):

o A 5000 sq ft lot zoned LDT in an Urban Village is now limited to 3 units and would be flats or townhouses with legal access provided perpendicular to the street. The proposal would force use of the certified green bonuses to retain 3 townhouse units, but could allow 3 rowhouses each with an accessory unit above, yielding 6 units - a 100% increase in unit density.

o A 5,000 sq ft lot zoned L1 in an Urban Village previously would allow 3 units, most typically townhouses with their own parking. Now as an LR2, if built green, the project could include 12 small apartments (~500 sq ft) with no parking provided – a 400% increase in units.

o A 5,000 sq ft lot zoned L2 outside of an Urban Village is now limited to 4 units and if unit lot access easements were enforced they would likely be flats or the lot would be combined with another to gain enough area for the access. The same potential as noted above (12 units) is possible if the proposed sharing of parking can be arranged. This is a 300% increase in units.

3. FAR as the overriding bulk/scale control will yield unpredictable lot coverage results and exacerbate the loss of the clear delineation between low-density MF zones and high-density zones. All zones now can yield a variety of density and building type outcomes.

Floor area ratio is a general planning bulk and scale tool for identifying project capacity where established patterns of open space and building placement make little difference. Applying it to low scale residential building types with fractional differentiation for various conditions is not appropriate. It might be easy to discern the difference between a building of FAR 2 and one of FAR 3, but not the difference between 1.2 and 1.3.

By choosing to use FAR as a way to incent or disincent certain building forms, rather than clearly allow or disallow, means profitability will rule what buildings are built and how they cover the lot. This defeats one of the primary objectives of land use regulations—the investment security of having a rough idea of the future of one's immediate vicinity.

Instead, specific building types, as identified by Neighborhood Design Guidelines should be considered. Also, specific building forms should be tied to zones as is being done elsewhere in the country. This ensures that the higher density projects are produced in appropriate places and that permeable open space is promoted elsewhere in compensation.[2]

Parking Requirements 
Removal of parking requirements for projects in Urban Villages does not recognize real issues with severe parking problems in some neighborhoods. With likely Metro service cuts we will see street congestion exacerbated. Many neighborhoods are extremely concerned about the shortsightedness of these rules, and believe that this change in fact only externalizes development cost to the broader community by placing parking on the street. At the same time, these cars will compete with spaces that could be used by customers of small businesses and other visitors to the community. More granularity is needed in the determination of where parking should be required or exempted. At a minimum, a multi-unit project should require some shared parking if the area is already at an over-parked state (residential Parking Zone).

Design Review

Design review and citizen participation are being dramatically weakened or removed with the use of SDR. We are adamant that a strong design review process is the citizen’s right based on our Comprehensive Plan[3] and is necessary to develop quality infill in the multifamily zones by providing the developer with flexibility and input from the community.

The Design Review process however is already weakened by the ‘stacking’ of Boards with industry professionals who in review of their contemporaries’ projects are unwilling to seriously critique or pursue concerns voiced by the community, and is further made ineffective by Director rulings that allow unacceptable departures from the code. While perhaps ultimately in the project’s favor, it is a costly process and time-consuming process and one that only induces mistrust or contempt in our city agencies.

We believe that a strong citizen-based regularly-monitored design review processes (ADR, SDR, and DRB), along with recognition of extant neighborhood plans and sound codes will yield the best outcomes for our city. We would like to see more citizen staffing on Boards and, when development is more active, more Boards to ensure that projects may be reviewed in a timely manner. We also insist on the right to appeal decisions made by the Director concerning projects of 4 or more units in our neighborhoods.

Other 

We object to the abdication for any responsibility in this legislation for the recognized Unit Lot Subdivision problems, including questionable access easements and optional CC&Rs. We remain concerned about how these multi-building projects with shared streetscapes and building elements will be maintained and whether there remains the potential for blighting. CC&Rs (Covenants, Conditions and Restrictions) should be required for all multifamily projects with shared areas and easements in order to address issues related to insurance, maintenance of common areas, building upkeep.

SUMMARY

The proposed legislation reflects a underlying disregard for the built environment and urban design elements of our neighborhoods in exchange for freedom of design for a project on a lot. Your cover letter dated October 18 states one of the goals for these amendments is to “Generally maintain the current overall scale and density of Lowrise zones”.
Yet these zone redesignations and code changes replace a clear delineation of densities and intensity of use from low duplex/triplex through the more intense larger-form structures with many units. We now have the possibility of

1. similar sized buildings, building types and similar unit densities throughout all the lowrise zones regardless of zone designation, and

2. loss of predictability about the number of units and unit size in all lowrise zones, and

3. an abandonment of urban design principles disturbing the existing characteristics of our neighborhoods, including yard and streetscape patterns.

A neighborhood is left with little certainty of how much can be built and what it will look like.

We are NOT against density, particularly in Urban Villages. What we strongly object to is the loss of gradation and the increased potential for incongruous development, the loss of targeted densities through zoning, and the potential disregard for extant conditions that would affect how projects are added to our communities.

We assert that the issues that remain with the proposed legislation are critical, represent divergence from our Comprehensive Plan, and yet are fixable. Please allow the additional public analysis necessary through a similar exercise to the black hat/white hat’ effort last year that uncovered the variety of flaws with the original Nickels proposal. We must complete this task and allow refinement to correct these significant errors.

Thank you for considering the views of the Seattle Community Council Federation. We look forward to hearing back from you soon.

Sincerely,

Jeannie Hale, President
3425 West Laurelhurst Drive NE
Seattle, Washington 98105

206-525-5135 / fax 206-525-9631

jeannieh@serv.net



ENC

[1] Appendix B, the map of these upzones, belies the declaration that there is “no upzoning.” It took several years of costly “remapping” by petition to resolve a similar deception in 1988 through 1991.

[2] This is consistent with the Comprehensive Plan “Yards and Open Space” Policies LU36 & 37, and “Environment” Policy LU10: “Strive to increase the amount of permeable surface and vegetative cover in the city in order to mitigate the heat island effect of developed areas, control storm water flows and reduce pollution.”

[3] LU 55: Employ a design review process to promote development that:. . . Allows for diversity and creativity in building design and site planning.

Thursday, November 25, 2010

Free Trees For Your Yard!

Despite the very cold weather the past few days, ideal tree planting time is nearly upon us! Seattle reLeaf is offering free trees for your yard! Details are below.
The Seattle reLeaf Trees for Neighborhoods program is pleased to offer you free trees to plant in your yard. Planting trees is a great way to lower your carbon footprint. An average city tree will absorb about a ton of harmful carbon dioxide over its lifetime. Urban trees also help keep our water clean, our air breathable, provide habitat for birds and other wildlife and make Seattle a vibrant place to live and work.
Tree supply is limited, so it is first come, first served. Applications will not be accepted after Dec 6. Program participants will receive up to 4 free trees per household, watering bags, a bag of GroCo compost, and training on proper tree planting and care.
Available species include:
Shore pine (Pinus contorta 'Contorta')
Katsura (Cercidiphyllum japonicum)
Red oak (Quercus rubra)
Western red cedar (Thuja plicata 'Excelsa')
Douglas fir (Pseudotsuga menziesii)
To receive a free tree, you must meet these guidelines:
Live in Seattle, and plant the tree on your property (renters must have their landlord's permission)
Plant the trees in your yard, and not as street trees
Do NOT plant the trees under power lines (these are large trees that will eventually grow into the power lines)
Commit to caring for the tree in the future, including watering for the first 3 summers
To get your trees, send in the application ASAP.
Questions can be directed to: 
Jana Dilley 
Seattle reLeaf
206-615-1668